Bligh Voller Nied is famous firm in Australia that was the
winner of the competition organized about the construction of
the Sydney Olympic Stadium. The company Bligh Voller Nied with
the Lobb Partnership from London were those who made the most
representative design of the Sydney Olympic Stadium. The stadium
is located in Homebush Sydney, Australia. The project of the
construction was finished in 1999 with a cost 690 million
Australian dollars. The 2000 Summer Olympics was held at the
stadium and the Rugby World Cup Final of 2003. At first, the
stadium was constructed to receive 110,000 spectators; it was
reconfigured in 2003 and could only hold 81,500 for an oval
field and 83,500 for a rectangular field. |
|